Three stages and three technologies as L-Acoustics transforms the sound of Les Escales

At the Saint-Nazaire festival, B Live and Altis deployed a different L-Acoustics technology on each stage — L2, L-ISA and L-Acoustics DJ — while the main stage's actual power consumption was monitored as part of a French research programme.
For three days every July, Les Escales music festival transforms the working port of Saint-Nazaire in western France. Since 1992, the event has taken over Île du Petit Maroc, a narrow strip of land between the Loire estuary and the Atlantic Ocean, with a musical programme spanning pop, rock, rap and electronic music.
This year's 34th edition brought artists including Archive, Gaël Faye and Benjamin Biolay to the quayside and opened with a private evening for 6,000 of the city's shipyard workers.
Les Escales is organised by a non-profit association with a long-standing commitment to assessing and reducing its carbon footprint. In 2026, the festival turned its site into a testing ground for the next generation of festival sound systems and, at the same time, a field laboratory to measure how much energy these systems actually require.
![]() |
![]() |
One technology for each stage
B Live, a certified L-Acoustics provider based in Carquefou, near Nantes, has supplied L-Acoustics sound systems to Les Escales since the festival's earliest editions.
For 2026, B Live technical director Samuel Birais worked alongside Julien Potin, technical director of Les Escales, and the L-Acoustics team to rethink what each stage could offer.
Engineers love talking about equipment, but ultimately, the only thing that matters is the audience. We asked ourselves what could provide a better experience for festivalgoers, and the answer was to use a different technology on each stage: L2 on the main stage, L-ISA on the Estuaire stage and L-Acoustics DJ in Club 360, says Birais.
The approach had to accommodate several constraints. The festival had reduced its capacity and budget, visiting productions still expected their technical riders to be met, and several stages shared a relatively small island, making sound bleed between them a constant concern.
In addition, Les Escales wanted to power its installations from the local electricity grid, which meant carefully assessing the consumption of every amplifier channel.
L2 on Scène du Port, with fewer amplifier channels
On Scène du Port, under the supervision of system engineer Laurent Pinet, two L2 over one L2D per side were flown, together with one L2 over one L2D per side as out-fill systems.

Low-frequency reproduction was handled by 18 KS28 in cardioid configuration, distributed across left, right and centre positions, while four Kara II per side provided coverage for the front rows of the audience. The system was powered by LA7.16 and LA12X amplified controllers.
"L2 gives us the coverage we need for the main stage with fewer amplifiers, making it the right choice for a festival that wants to operate on mains power", explains Birais. "And if we add up the rated power of every amplifier, we end up sizing the installation for a much higher energy demand than is actually required".
Measuring the system's actual power consumption
To replace these estimates with real-world data, L-Acoustics collaborated with energy monitoring specialist Visu Énergie to record the main stage's electrical consumption throughout the festival.
The collected data feeds into M.A.T.R.I.C.E., a three-year French research programme focused on the environmental footprint of music touring.
The initiative is led by live music industry organisation Ekhoscènes, with Live Nation and L-Acoustics among its partners, and is supported by the France 2030 investment plan.
We all had expectations based on laboratory results, and a real festival gave us the opportunity to put them to the test. The system consumed much less energy than we expected, and its consumption was very linear. This data helps festivals determine whether they need to use generators, explains Axelle Meunier of the L-Acoustics corporate social responsibility (CSR) team.
L-ISA on Scène Estuaire
On Scène Estuaire, B Live system engineer Pierre Tranchant worked with a frontal L-ISA configuration comprising five arrays, each consisting of two A15 Focus and one A15 Wide. The system was completed by eight KS21 subwoofers, two X12 for out-fill and seven X8 as spatial in-fill, powered by LA12X and LA4X amplified controllers.
![]() |
![]() |
Before the festival, B Live and La FabSonic briefed the visiting sound engineers on the system's capabilities so they would arrive at the venue already familiar with what the stage could offer.
"Introducing a new technology at a festival is a real challenge", says Birais. "At an indoor venue in winter, you might have four hours of rehearsal time. At a festival, the band arrives at the last minute and goes straight on stage, so the work has to be done before they get there".
During soundcheck, the engineer for French rapper Georgio rebuilt his usual touring mix object by object to adapt it to the immersive system.
L-Acoustics DJ in Club 360
Club 360 is an open-air dance floor surrounded by shipping containers, with the DJ positioned at the centre of the space.
Saint-Nazaire-based company Altis, under the technical direction of Wojtek Rola, was responsible for equipping this stage.
The main system consisted of two L2D with KS28 subwoofers, while six stacks comprising one A15 Focus and one A15 Wide, mounted on structures above the containers, completed the circular coverage. The installation also included eight X8 distributed around the central stage, with LA7.16 and LA12X amplified controllers powering the system.
The DJs performed stereo sets using their usual equipment, while L-Acoustics DJ separated each music track into vocals, synths, bass and drums in real time, distributing these sonic elements around the dance floor.
Rola personally explained how the system worked to each artist before their performance, and DJs including Tina Ardor and La Louuve embraced its creative possibilities.

"Once they understand what L-Acoustics DJ does and hear it for themselves, every artist is immediately on board", says Birais.
P1 processors and LS10 switches enabled audio distribution via the Milan-AVB protocol across all three stages, while L-ISA processors handled spatial audio on Estuaire and Club 360.
Preventing sound bleed between the three stages
B Live integrated all three stages into a single Soundvision file to assess how each system would behave in relation to its neighbouring stages. "It's a small site with a lot of stages, so we used Soundvision to focus the sound exactly where we needed it and ensure that all the stages could operate simultaneously", explains Birais.
During the festival, the L-Acoustics team also carried out a lidar scan of the site to generate an accurate three-dimensional model in Soundvision and study how sound propagated beyond the festival perimeter.
The findings will help optimise stage positioning for the 2027 edition.
The best feedback is simple: everybody was dancing throughout the festival. This project was a genuine partnership between Les Escales, L-Acoustics and B Live. And because we measured what we actually consumed, we now know how much energy it takes to deliver that experience to the audience, concludes Birais.
Image credits: © Alan Goude, © Brice.Photo
Follow L-Acoustics
Latest
Home →
Ryan Penny takes the helm of d&b audiotechnik's sales operations in the US

ETC Halcyon becomes an integral part of the technical setup behind major musicals

Four nights, 545 lighting fixtures and a grandMA3 system for Oques Grasses’ farewell concert

From cathedral acoustics to the sound of a rock band with Meyer Sound's NADIA

System of a Down turns 96 iESPRITE LTL fixtures into a wall of light synchronised with video

A home run of light: eleven Robe SVOPATT fixtures take centre stage in the Sunday Night Baseball opening sequence

The Rockettes' Christmas Spectacular expands its AV production with real-time cameras

L-Acoustics marks a milestone in Europe with its first L-ISA installation in a church











Instagram
Facebook
LinkedIn
X
YouTube
TikTok